Vinyl Welding Beads WBS 5
Call for shipping qoute
Vinyl Welding Beads WBS 5
By FLEXCO
$12
1.99 /Sqft
66,476.00 /Box
23.77 /Sqft/Box
Add Molding & Accessories
Store pick up Carrollton Texas or Call for shipping qoute
Have a question?
FUSE TILES + SHEET FOR SEAMLESS INSTALLATION
We offer welding beads that enable installers to quickly fuse our pre-grooved rubber or vinyl floor tiles or rubber sheet flooring into a seamless floor. The process is easy, fast and permanent⎯ideal for commercial spaces with stringent hygiene requirements.
Rubber and vinyl welding beads
- Stand up to continual and extensive wet cleaning
- Ideal for operating theaters, laboratories and clean rooms
- Custom colors are available with a minimum quantity of 50 linear feet
- Available in 50' and 400' rolls
-
Vinyl Welding Beads
Order Prefix: WBV
Vinyl Welding Beads are available to match the background colors of Delane SVT and ESD tiles.50 Ft. Roll Size 24" × 24" Tiles Divide square feet by 50 for rolls required 36" × 36" Tiles Divide square feet by 75 for rolls required 400 Ft. Roll Size 24" × 24" Tiles Divide square feet by 400 for rolls required 36" × 36" Tiles Divide square feet by 600 for rolls required





